fbpx

Resurfacing On The A75 Eastbound At Collin Bypass Commences Sunday 17th September

Amey, on behalf of Transport Scotland as part of the Network Management Contract for the South-West Trunk Road Unit, are undertaking essential resurfacing on the A75 eastbound at Collin Bypass from Sunday 17th September until Friday 22nd September 2023.

This scheme will benefit around 6,600 vehicles using this route each day, by improving the condition of the carriageway and reducing the need for more extensive maintenance in the future.

The work will be carried out using a contraflow from 8pm on Sunday 17th September until 6am on Friday 22nd September 2023. There will be lane closures during the day on Sunday 17th September 2023 to install the contraflow and there will be four-way temporary traffic lights in place for the duration of the contraflow to allow access from Collin and the B724.

Access for emergency service vehicles will be maintained throughout these works.

Please note, all schemes are weather dependent and may be cancelled or rescheduled if weather conditions are not favourable.

Latest Articles