Amey, on behalf of Transport Scotland as part of the Network Management Contract for the South West Trunk Road Unit, are undertaking investigation works prior to undertaking essential maintenance on the A75 Cardoness Bridge on Tuesday 25th January 2022, between the hours of 9am and 5pm.
This scheme, with a value of £60,000, will benefit around 4,000 vehicles using this route each day, by improving the condition of the carriageway and reducing the need for more extensive maintenance in the future.
The work will be carried out using a phased lane closure of the A75 with a three-way temporary traffic light system in place.
Access for emergency service vehicles will be maintained throughout these works.
Our operatives will follow strict physical distancing and hygiene protocols throughout the programme, in line with the Scottish Government’s COVID-19 guidance.
Please note, all schemes are weather dependent and may be cancelled or rescheduled if weather conditions are not favourable.
- A free Road Work Alerts service is available from our website: https://swtrunkroads.scot/roadwork-alerts/ An email address is all that is required to sign up for the service.
- To report a problem on the network please visit: https://swtrunkroads.scot/report-a-problem/
- Real-time journey information can be obtained by visiting www.trafficscotland.org or via Twitter: @TrafficScotland